DocumentCode
1721990
Title
Greenfield planning of modern metropolises
Author
Audring, D. ; Hable, M. ; Lerch, E. ; Schilling, K.
Author_Institution
E.D. SE PTI, Siemens AG, Erlangen, Germany
fYear
2009
Firstpage
1
Lastpage
6
Abstract
This paper describes the challenges and opportunities of greenfield planning of economic power systems. Planning criteria and methodology of network planning have to be adapted and optimised for greenfield development of a new metropolises. The approach to designing a high voltage network for an entire city from scratch is explained. Necessary network studies and investigations are described. Efficient network concepts, including voltage level selection, transmission and distribution network topologies are discussed. Dynamic aspects are explained, such as frequency and voltage stability. As the new cities sometimes start their development at island operation, the power system has to be capable to operate islanded as well as connected to a national grid.
Keywords
power system economics; power system planning; power system stability; distribution network topologies; economic power systems; frequency stability; greenfield planning; modern metropolises; network planning; transmission network topologies; voltage level selection; voltage stability; Cities and towns; Frequency; Network topology; Optimization methods; Power generation economics; Power system dynamics; Power system economics; Power system planning; Power system stability; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
PowerTech, 2009 IEEE Bucharest
Conference_Location
Bucharest
Print_ISBN
978-1-4244-2234-0
Electronic_ISBN
978-1-4244-2235-7
Type
conf
DOI
10.1109/PTC.2009.5282082
Filename
5282082
Link To Document