• DocumentCode
    1729755
  • Title

    Progress of I&C system and control room design in TEPCO nuclear power plants

  • Author

    Iwaki, Katsuhiko

  • Author_Institution
    Tokyo Electric Power Co. Inc., Japan
  • fYear
    1992
  • Firstpage
    80
  • Lastpage
    84
  • Abstract
    Three generation of Tokyo Electric Power Co.´s (TEPCO´s) standardized control room design, along with the I&C technologies which support the improvements among these control room designs, are discussed. The first-generation-type control room design features large size control room panels, which, after the Three Mile Island Accident, have been modified. The second-generation-type control room panels incorporate CRT-based operation and enhanced automation features. These control room design improvements were made possible through the use of powerful process computers and highly reliable digital controllers. The third-generation-type control room design, developed for application in the advanced boiling water reactor (ABWR) plants, has the goals of enhancing the reliability of the operation during emergencies and optimizing the efficiency and effectiveness of the operating crew. The development of the ABWR control room design has been guided by the operation experience of the second-generation-type control panels and analysis of the operators´ workload analsis as well as the progression of state of the art technologies.<>
  • Keywords
    computerised instrumentation; control facilities; fission reactor operation; fission reactor safety; fission reactor theory and design; human factors; nuclear engineering computing; nuclear power stations; power station computer control; ABWR; CRT-based operation; TEPCO nuclear power plants; Three Mile Island Accident; advanced boiling water reactor; control room design; digital controllers; emergencies; enhanced automation features; first-generation-type control room; human factors; instrumentation and control system; large size control room panels; operating crew; operation experience; process computers; reliability; second-generation-type control room panels; standardized control room design; state of the art technologies; third-generation-type control room design; workload analsis; Accidents; Application software; Automatic control; Automatic generation control; Automation; Control systems; Digital control; Nuclear power generation; Power generation; Size control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Human Factors and Power Plants, 1992., Conference Record for 1992 IEEE Fifth Conference on
  • Conference_Location
    Monterey, CA, USA
  • Print_ISBN
    0-7803-0888-3
  • Type

    conf

  • DOI
    10.1109/HFPP.1992.283432
  • Filename
    283432