• DocumentCode
    1732350
  • Title

    Performance and design of over head LV bundle conductor systems in an environment of high lightning activity and high pollution

  • Author

    Geldenhuys, Hendri

  • Author_Institution
    Eskom, Distribution Technology - South Africa
  • fYear
    2005
  • Firstpage
    1
  • Lastpage
    3
  • Abstract
    Eskom participates in South Africa´s electrification program which started in 1992 and is still continuing. Eskom made 350 000 connections per year at the peak of the program. Eskom lead the industry in reducing first capital costs in the program by more than 50%. [1]
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution, 2005. CIRED 2005. 18th International Conference and Exhibition on
  • Conference_Location
    Turin, Italy
  • Type

    conf

  • Filename
    5428188