DocumentCode
1732350
Title
Performance and design of over head LV bundle conductor systems in an environment of high lightning activity and high pollution
Author
Geldenhuys, Hendri
Author_Institution
Eskom, Distribution Technology - South Africa
fYear
2005
Firstpage
1
Lastpage
3
Abstract
Eskom participates in South Africa´s electrification program which started in 1992 and is still continuing. Eskom made 350 000 connections per year at the peak of the program. Eskom lead the industry in reducing first capital costs in the program by more than 50%. [1]
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution, 2005. CIRED 2005. 18th International Conference and Exhibition on
Conference_Location
Turin, Italy
Type
conf
Filename
5428188
Link To Document