Title
Project risk allocation through contingent cost allocation
Author
TANIMOTO, Keishi ; Okada, Norio ; Tatano, Hirokazu
Author_Institution
Fac. of Eng., Tottori Univ., Japan
Volume
1
fYear
2000
fDate
2000
Firstpage
512
Abstract
In a joint project, the project cost is allocated to the participants. How to allocate the cost has been discussed mainly in cooperative game theory assuming that the cost is certain. If the project cost is uncertain, each participant is exposed to the risk of allocated cost. Thus the risk should be allocated according to the risk acceptance level for each participant. For this risk allocation, a stochastic cooperative game is useful rather than a cooperative game based on the certainty of cost. We develop a contingent cost allocation scheme in which the risk is transferred mutually in order to attain efficient risk allocation by a stochastic cooperative game. As a result, the efficient risk allocation is derived so that all participants are better off than the allocation which does not transfer the risk mutually
Keywords
costing; project management; resource allocation; risk management; stochastic games; contingent cost allocation; cooperative game theory; project risk allocation; risk acceptance level; stochastic cooperative game; uncertain project cost; Buildings; Costs; Game theory; Insurance; Stochastic processes; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man, and Cybernetics, 2000 IEEE International Conference on
Conference_Location
Nashville, TN
ISSN
1062-922X
Print_ISBN
0-7803-6583-6
Type
conf
DOI
10.1109/ICSMC.2000.885044
Filename
885044
Link To Document