    Project risk allocation through contingent cost allocation

  • Author

    TANIMOTO, Keishi ; Okada, Norio ; Tatano, Hirokazu

  • Author_Institution
    Fac. of Eng., Tottori Univ., Japan
  • Volume
    1
  • fYear
    2000
  • fDate
    2000
  • Firstpage
    512
  • Abstract
    In a joint project, the project cost is allocated to the participants. How to allocate the cost has been discussed mainly in cooperative game theory assuming that the cost is certain. If the project cost is uncertain, each participant is exposed to the risk of allocated cost. Thus the risk should be allocated according to the risk acceptance level for each participant. For this risk allocation, a stochastic cooperative game is useful rather than a cooperative game based on the certainty of cost. We develop a contingent cost allocation scheme in which the risk is transferred mutually in order to attain efficient risk allocation by a stochastic cooperative game. As a result, the efficient risk allocation is derived so that all participants are better off than the allocation which does not transfer the risk mutually
  • Keywords
    costing; project management; resource allocation; risk management; stochastic games; contingent cost allocation; cooperative game theory; project risk allocation; risk acceptance level; stochastic cooperative game; uncertain project cost; Buildings; Costs; Game theory; Insurance; Stochastic processes; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man, and Cybernetics, 2000 IEEE International Conference on
  • Conference_Location
    Nashville, TN
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-6583-6
  • Type

    conf

  • DOI
    10.1109/ICSMC.2000.885044
  • Filename
    885044