DocumentCode
177112
Title
Project scheduling with time window constraints on multi-skill resources
Author
Liao Guang-Rui ; Liu Zhen-yuan ; Bi Yang
Author_Institution
Coll. of Autom., Huazhong Univ. of Sci. & Technol., Wuhan, China
fYear
2014
fDate
May 31 2014-June 2 2014
Firstpage
4885
Lastpage
4891
Abstract
In practice, multi-skilled labor is widely used. There are constraints of available and unavailable time on those resources, and each resource possesses multiple different skills. For the resource attributes of multiple skills and time windows, it´s extremely challenging to arrange the activities and allocate resources in project scheduling. Aimed at this kind of problems, a mathematic programming model is developed and a Rollout Algorithm based on priority rules is proposed. In order to allocate resources quickly, a heuristic method for resource allocation is embedded in the algorithm. The results of some numerical experiments indicate that the performance of the proposed algorithm could obtain the satisfactory solution of the problem and be suitable for solving the problems of large scale. It is verified that the algorithm is effective.
Keywords
mathematical programming; project management; resource allocation; scheduling; heuristic method; mathematic programming model; multiskill resources; multiskilled labor; priority rules; project scheduling; resource allocation; rollout algorithm; time window constraints; Automation; Bismuth; Educational institutions; Image processing; Intelligent control; Laboratories; Time factors; Multi-Skill; Resource-Constrained Project Scheduling; Rollout Algorithm; Time Windows;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference (2014 CCDC), The 26th Chinese
Conference_Location
Changsha
Print_ISBN
978-1-4799-3707-3
Type
conf
DOI
10.1109/CCDC.2014.6853048
Filename
6853048
Link To Document