• DocumentCode
    177112
  • Title

    Project scheduling with time window constraints on multi-skill resources

  • Author

    Liao Guang-Rui ; Liu Zhen-yuan ; Bi Yang

  • Author_Institution
    Coll. of Autom., Huazhong Univ. of Sci. & Technol., Wuhan, China
  • fYear
    2014
  • fDate
    May 31 2014-June 2 2014
  • Firstpage
    4885
  • Lastpage
    4891
  • Abstract
    In practice, multi-skilled labor is widely used. There are constraints of available and unavailable time on those resources, and each resource possesses multiple different skills. For the resource attributes of multiple skills and time windows, it´s extremely challenging to arrange the activities and allocate resources in project scheduling. Aimed at this kind of problems, a mathematic programming model is developed and a Rollout Algorithm based on priority rules is proposed. In order to allocate resources quickly, a heuristic method for resource allocation is embedded in the algorithm. The results of some numerical experiments indicate that the performance of the proposed algorithm could obtain the satisfactory solution of the problem and be suitable for solving the problems of large scale. It is verified that the algorithm is effective.
  • Keywords
    mathematical programming; project management; resource allocation; scheduling; heuristic method; mathematic programming model; multiskill resources; multiskilled labor; priority rules; project scheduling; resource allocation; rollout algorithm; time window constraints; Automation; Bismuth; Educational institutions; Image processing; Intelligent control; Laboratories; Time factors; Multi-Skill; Resource-Constrained Project Scheduling; Rollout Algorithm; Time Windows;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (2014 CCDC), The 26th Chinese
  • Conference_Location
    Changsha
  • Print_ISBN
    978-1-4799-3707-3
  • Type

    conf

  • DOI
    10.1109/CCDC.2014.6853048
  • Filename
    6853048