• DocumentCode
    1807780
  • Title

    Schedule risk management at early stages of large construction projects based on the GERT model

  • Author

    Xianyi Gao ; Yaqiang Shen ; Jing Lin

  • Author_Institution
    School of Economics and Management, Tongji University, Shanghai 200092, China
  • fYear
    2013
  • fDate
    1-8 Jan. 2013
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The schedule risk increases as the construction projects are becoming larger and more complex. Therefore, it´s very important to take control of the schedule risk. But most of the research about the schedule risk control concentrated on the implementation stage of a project, the schedule risk at the early stages of a project is often overlooked. In order to explore this issue, we analyze the schedule risk at the early stages and establish a GERT network model using the random network technology. In conclusion, we calculate the model to quantify the schedule risk at the early stages and provide some risk control proposals for the decision-making according to the model.
  • Keywords
    Decision making; Economics; Educational institutions; Proposals; Risk management; Schedules; GERT model; early stages; large construction projects; schedule risk;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Conference Anthology, IEEE
  • Conference_Location
    China
  • Type

    conf

  • DOI
    10.1109/ANTHOLOGY.2013.6785060
  • Filename
    6785060