• DocumentCode
    1820198
  • Title

    Understanding the requirements for project management maturity models: Awareness of the ICT industry in Malaysia

  • Author

    Jamaluddin, R. ; Chin, C.M.M. ; Lee, C.W.

  • Author_Institution
    Dept. of Mech., Univ. of Nottingham, Nottingham, Malaysia
  • fYear
    2010
  • fDate
    7-10 Dec. 2010
  • Firstpage
    1573
  • Lastpage
    1577
  • Abstract
    Surveys reveal that the higher the organization project management maturity level is, the greater it enhances project performance. However it is vital to first understand the requirements of such a maturity model in the context of the target industry or sector. In this study, we aim to assess the current status of project management maturity model (PMMM) adoption in Malaysia´s ICT industry as an initiative to conceptualize a model for use in the sector. An online survey was carried out to investigate the level of PMMM awareness, its extent of adoption or practices and its prerequisite requirements for use in the ICT industry. Based on our findings, a preliminary framework of the PMMM is proposed in our next phase of study.
  • Keywords
    information industry; organisational aspects; project management; ICT Industry; Malaysia; project management maturity models; Capability maturity model; Companies; Industries; Project management; Standards organizations; ICT industry; maturity models; project management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
  • Conference_Location
    Macao
  • ISSN
    2157-3611
  • Print_ISBN
    978-1-4244-8501-7
  • Electronic_ISBN
    2157-3611
  • Type

    conf

  • DOI
    10.1109/IEEM.2010.5674174
  • Filename
    5674174