DocumentCode
1820198
Title
Understanding the requirements for project management maturity models: Awareness of the ICT industry in Malaysia
Author
Jamaluddin, R. ; Chin, C.M.M. ; Lee, C.W.
Author_Institution
Dept. of Mech., Univ. of Nottingham, Nottingham, Malaysia
fYear
2010
fDate
7-10 Dec. 2010
Firstpage
1573
Lastpage
1577
Abstract
Surveys reveal that the higher the organization project management maturity level is, the greater it enhances project performance. However it is vital to first understand the requirements of such a maturity model in the context of the target industry or sector. In this study, we aim to assess the current status of project management maturity model (PMMM) adoption in Malaysia´s ICT industry as an initiative to conceptualize a model for use in the sector. An online survey was carried out to investigate the level of PMMM awareness, its extent of adoption or practices and its prerequisite requirements for use in the ICT industry. Based on our findings, a preliminary framework of the PMMM is proposed in our next phase of study.
Keywords
information industry; organisational aspects; project management; ICT Industry; Malaysia; project management maturity models; Capability maturity model; Companies; Industries; Project management; Standards organizations; ICT industry; maturity models; project management;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
Conference_Location
Macao
ISSN
2157-3611
Print_ISBN
978-1-4244-8501-7
Electronic_ISBN
2157-3611
Type
conf
DOI
10.1109/IEEM.2010.5674174
Filename
5674174
Link To Document