DocumentCode
1823865
Title
The risk monitoring of coal construction project based on system dynamics model
Author
Yun-cai Ning ; Yu-yan Mao
Author_Institution
Manage. Dept., China Univ. of Min. & Technol. (Beijing), Beijing, China
fYear
2011
fDate
25-27 Nov. 2011
Firstpage
330
Lastpage
334
Abstract
The construction project of coal mine is characterized by onetime, high cost, long duration, difficult construction, technical complexity and multitudinous project participants, whose risk events occur frequently in its construction. Therefore, the risk monitoring of construction project of coal mine is of theoretical significance and practical value. The risk control problems of coal mine construction project were studied from two aspects in the paper: First of all, the organizational framework and process of risk monitoring about coal mine construction project are built; Secondly, the issues about the risk monitoring of construction project of coal mine are dynamically and quantitatively researched through the establishment of system dynamics model.
Keywords
coal; mining industry; process monitoring; project management; risk analysis; coal construction project; coal mine; project cost; project technical complexity; risk monitoring; system dynamics model; Coal mining; Joints; Monitoring; Organizations; Process control; Risk management; Security; Coal; Monitoring; Risk; System Dynamics;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Systems for Crisis Response and Management (ISCRAM), 2011 International Conference on
Conference_Location
Harbin, Heilongjiang
Print_ISBN
978-1-4577-0369-0
Type
conf
DOI
10.1109/ISCRAM.2011.6184127
Filename
6184127
Link To Document