• DocumentCode
    1823865
  • Title

    The risk monitoring of coal construction project based on system dynamics model

  • Author

    Yun-cai Ning ; Yu-yan Mao

  • Author_Institution
    Manage. Dept., China Univ. of Min. & Technol. (Beijing), Beijing, China
  • fYear
    2011
  • fDate
    25-27 Nov. 2011
  • Firstpage
    330
  • Lastpage
    334
  • Abstract
    The construction project of coal mine is characterized by onetime, high cost, long duration, difficult construction, technical complexity and multitudinous project participants, whose risk events occur frequently in its construction. Therefore, the risk monitoring of construction project of coal mine is of theoretical significance and practical value. The risk control problems of coal mine construction project were studied from two aspects in the paper: First of all, the organizational framework and process of risk monitoring about coal mine construction project are built; Secondly, the issues about the risk monitoring of construction project of coal mine are dynamically and quantitatively researched through the establishment of system dynamics model.
  • Keywords
    coal; mining industry; process monitoring; project management; risk analysis; coal construction project; coal mine; project cost; project technical complexity; risk monitoring; system dynamics model; Coal mining; Joints; Monitoring; Organizations; Process control; Risk management; Security; Coal; Monitoring; Risk; System Dynamics;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Systems for Crisis Response and Management (ISCRAM), 2011 International Conference on
  • Conference_Location
    Harbin, Heilongjiang
  • Print_ISBN
    978-1-4577-0369-0
  • Type

    conf

  • DOI
    10.1109/ISCRAM.2011.6184127
  • Filename
    6184127