DocumentCode
1829596
Title
Factors influencing project quality in the design phase of building projects: A case in the Department of Building and Engineering Services of Botswana
Author
Dodoo, E.N.D. ; van Waveren, C.C. ; Chan, K.-Y.
Author_Institution
Grad. Sch. of Technol. Manage., Univ. of Pretoria, Tshwane, South Africa
fYear
2010
fDate
7-10 Dec. 2010
Firstpage
651
Lastpage
655
Abstract
There were numerous complaints regarding the quality of building projects ran by the Department of Building and Engineering Services (DBES) in Botswana. The aim of this study is to evaluate participants involving DBES projects by using 16 factors in the project design phase which may influence the quality of building projects. Empirical results show that DBES lacks commitment to continuous quality improvement and poor use of lessons learned to improve quality. The key focus area is adherence to project management principles and poor level in this area may contribute towards DBES´s poor project quality. Moreover, this study identified 3 types of groups based from the respondents´ attributes and explored the differences in group means.
Keywords
building; design engineering; project management; Botswana; DBES; Department of Building and Engineering Services; building services; design phase; project design; project management; project quality; Buildings; Employment; Government; Mechanical engineering; Planning; Project management; Training; building projects; project design phase; project management principles; project quality;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
Conference_Location
Macao
ISSN
2157-3611
Print_ISBN
978-1-4244-8501-7
Electronic_ISBN
2157-3611
Type
conf
DOI
10.1109/IEEM.2010.5674525
Filename
5674525
Link To Document