• DocumentCode
    1861558
  • Title

    Scheduling the dynamic job shop

  • Author

    Hoitomt, D.J. ; Luh, Peter B.

  • Author_Institution
    Pratt & Whitney, East Hartford, CT, USA
  • fYear
    1993
  • fDate
    2-6 May 1993
  • Firstpage
    71
  • Abstract
    The augmented Lagrangian decomposition and coordination technique is applied to a continuous-time formulation of the scheduling problem in a job shop environment. This methodology generates a variety of information that can be used to initialize the algorithm after changes occur, including Lagrange multipliers. In testing the algorithm on actual factory data, the impact of initialization is examined in the context of a fixed computation time. The results indicate that when computation time is limited, the use of initialization from the previous schedule improves the overall schedule quality
  • Keywords
    scheduling; Lagrange multipliers; Lagrangian coordination; augmented Lagrangian decomposition; dynamic job shop; initialization; scheduling; Continuous production; Dynamic scheduling; Flow production systems; Job shop scheduling; Production planning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1993. Proceedings., 1993 IEEE International Conference on
  • Conference_Location
    Atlanta, GA
  • Print_ISBN
    0-8186-3450-2
  • Type

    conf

  • DOI
    10.1109/ROBOT.1993.291869
  • Filename
    291869