• DocumentCode
    1879579
  • Title

    Development of plant maintenance management in China Light and Power distribution system

  • Author

    Yuen, D.C.M. ; Chow, L.M.

  • Author_Institution
    China Light & Power Co. Ltd., Hong Kong
  • fYear
    1993
  • fDate
    7-10 Dec 1993
  • Firstpage
    331
  • Abstract
    This paper describes the development of China Light and Power´s power system maintenance management strategies. It specifies long term preventive maintenance (LTPM), routine preventive maintenance (RPM), and special recommendations for distribution equipment which presently comprise 25,000 items of switchgear, 12,500 transformers, etc. In addition, CLP´s experience of using ultrasonic detection as a predictive maintenance measure and implementing RCM to improve maintenance productivity are also discussed
  • Keywords
    distribution networks; maintenance engineering; management; power transformers; switchgear; ultrasonic applications; China; development; distribution system; long term preventive maintenance; maintenance management; power system; power transformers; predictive maintenance; routine preventive maintenance; switchgear; ultrasonic detection;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Advances in Power System Control, Operation and Management, 1993. APSCOM-93., 2nd International Conference on
  • Conference_Location
    IET
  • Print_ISBN
    0-85296-569-9
  • Type

    conf

  • Filename
    292735