• DocumentCode
    1895197
  • Title

    Establishment of the B-2 avionics organic depot

  • Author

    Cotton, Robert ; Lopez, Jorge

  • Author_Institution
    OC-ALC/LALR, Tinker AFB, OK, USA
  • fYear
    1997
  • fDate
    22-25 Sep 1997
  • Firstpage
    212
  • Lastpage
    217
  • Abstract
    The original depot repair strategy for the B-2 avionics called for the prime contractor to acquire the automatic test equipment (ATE) and the test program sets (TPS). However, faced with reductions in support budgets, the B-2 System Program Office (SPO) was forced to reconsider this strategy. Under the revised strategy the ATE would be acquired through the prime contractor while the TPSs would be developed using organic and private industry resources. Program Management (PM) responsibility for this program was assigned to OC-ALC/LALR, the B-2 Avionics Support Branch. This paper presents an overview of the activities to date for the establishment of the B-2 avionics organic depot. Also, a review of the rationale for the decision to organically develop support is provided along with key risk reduction features of the program
  • Keywords
    automatic test equipment; automatic test software; integrated software; military avionics; risk management; weapons; ATE; B-2 avionics; TPS; acceptance testing; automatic test equipment; depot repair strategy; revised strategy; risk reduction; test program sets; Aerospace electronics; Coordinate measuring machines; Costs; Programming; Proposals; Radio frequency; Risk management; Subcontracting; Testing; Weapons;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    AUTOTESTCON, 97. 1997 IEEE Autotestcon Proceedings
  • Conference_Location
    Anaheim, CA
  • Print_ISBN
    0-7803-4162-7
  • Type

    conf

  • DOI
    10.1109/AUTEST.1997.633614
  • Filename
    633614