• DocumentCode
    1922068
  • Title

    Monitoring of a large scale event in the Brazilian Power System by WAMS

  • Author

    Decker, I.C. ; Agostini, M.N. ; e Silva, A.S. ; Dotta, D.

  • Author_Institution
    Fed. Univ. of Santa Catarina, Florianópolis, Brazil
  • fYear
    2010
  • fDate
    1-6 Aug. 2010
  • Firstpage
    1
  • Lastpage
    8
  • Abstract
    On November 10, 2009 a fault at the AC Itaipu transmission system led to a large scale blackout of the Brazilian Interconnected Power System (BIPS) with a 40% load loss. This event was recorded at outlet voltage by a synchronized phasor measurement prototype, the LVPMS, with PMUs (Phasor Measurement Units) installed in nine universities throughout Brazil. The recorded data contain relevant information on the events leading to the blackout and the BIPS restoration.
  • Keywords
    power system interconnection; power system measurement; power transmission faults; AC Itaipu transmission system; BIPS restoration; Brazilian interconnected power system; WAMS; data recording; large scale blackout; large scale event monitoring; outlet voltage; synchronized phasor measurement prototype; wide area system monitoring; Load flow; Oscillators; Phasor measurement units; Power transmission lines; Prototypes; Transmission line measurements; Voltage measurement; PMU; Phasor measurements; Power system monitoring; WAMS; Wide-area monitoring;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Bulk Power System Dynamics and Control (iREP) - VIII (iREP), 2010 iREP Symposium
  • Conference_Location
    Rio de Janeiro
  • Print_ISBN
    978-1-4244-7466-0
  • Electronic_ISBN
    978-1-4244-7465-3
  • Type

    conf

  • DOI
    10.1109/IREP.2010.5563249
  • Filename
    5563249