• DocumentCode
    1934472
  • Title

    Explanation of change (EoC) study: Considerations and implementation challenges

  • Author

    Bitten, R. ; Emmons, D. ; Hart, M. ; Bordi, F. ; Scolese, C. ; Hinners, N.

  • Author_Institution
    Aerosp. Corp., Los Angeles, VA, USA
  • fYear
    2013
  • fDate
    2-9 March 2013
  • Firstpage
    1
  • Lastpage
    13
  • Abstract
    This paper discusses the implementation of considerations resulting from a study investigating the cost change experienced by historical NASA science missions. The study investigated historical milestone and monthly status report documentation followed by interviews with key project personnel. The reasons for cost change were binned as being external to NASA, external to the project and internal to the project relative to the project´s planning and execution. Based on the results of the binning process and the synthesis of project meetings and interviews, nine considerations were made with the objective to decrease the potential for cost change in future missions. Although no one “magic bullet” consideration was discovered, the considerations taken as a whole should help reduce cost and schedule change in future NASA missions.
  • Keywords
    aerospace instrumentation; NASA science mission; binning process; explanation of change; Lead; NASA;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Aerospace Conference, 2013 IEEE
  • Conference_Location
    Big Sky, MT
  • ISSN
    1095-323X
  • Print_ISBN
    978-1-4673-1812-9
  • Type

    conf

  • DOI
    10.1109/AERO.2013.6496906
  • Filename
    6496906