DocumentCode
1935767
Title
About the speaker - Peter Dorey
Author
Dorey, Peter
fYear
2009
fDate
12-12 Feb. 2009
Firstpage
1
Lastpage
1
Abstract
Peter Dorey, TUV Product Service & Stuart Charles, Metronet Rail. The first half of the paper discusses management and control of electromagnetic compatibility (EMC) and lessons learnt from recent London Underground and mainline rail projects. Stakeholders in the process are considered and improvements to the EMC documentation required. Fixed installations require a responsible person to be identified. An installation can be divided into EMC zones. Gap analysis can be used to determine compliance of the installed equipment within the zone. The second half of the paper considers some specific low frequency harmonic problems associated with lift controllers on tube stations.
fLanguage
English
Publisher
iet
Conference_Titel
EMC in Railways, 2009 IET Seminar on
Conference_Location
London, UK
ISSN
0537-9989
Print_ISBN
978-1-84919-059-6
Type
conf
Filename
5067548
Link To Document