• DocumentCode
    1954664
  • Title

    Optimization of Scheduling for Construction Corporation

  • Author

    Aksyonov, Konstantin ; Bykov, Eugene ; Aksyonova, Olga

  • Author_Institution
    Dept. of Inf. Technol., Ural Fed. Univ., Ekaterinburg, Russia
  • fYear
    2013
  • fDate
    29-31 Jan. 2013
  • Firstpage
    310
  • Lastpage
    314
  • Abstract
    The paper dives into a set of tasks that emerge when planning activities of a corporation, involved into construction of multiple objects. This task is referred to as the problem of project portfolio. Problem of planning construction works and its software implementation are solved with aid of integration of multi-agent modeling and critical path method. The achieved benefit in time and cost relies on use of the simulation system and decision support system of BPsim products family, which has been developed by the authors. At the end of paper the economic effect of deployment and its calculations are briefly noted.
  • Keywords
    construction industry; critical path analysis; decision support systems; investment; multi-agent systems; project management; strategic planning; BPsim products; construction corporation scheduling optimization; construction work planning problem; corporation planning activities; critical path method; decision support system; economic effect; multiagent modeling; project portfolio problem; simulation system; software implementation; Analytical models; Buildings; Graphics; Load modeling; Multi-agent systems; Planning; Portfolios; agents; decision support systems; modeling; simulation; convolution; critical path method;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Systems Modelling & Simulation (ISMS), 2013 4th International Conference on
  • Conference_Location
    Bangkok
  • ISSN
    2166-0662
  • Print_ISBN
    978-1-4673-5653-4
  • Type

    conf

  • DOI
    10.1109/ISMS.2013.112
  • Filename
    6498286