DocumentCode
1960310
Title
An estimate and simulation approach to determining the Automated Guided Vehicle fleet size in FMS
Author
Yifei, Tao ; Junruo, Chen ; Meihong, Liu ; Xianxi, Liu ; Yali, Fu
Author_Institution
Fac. of Mech. & Electr. Eng., KunMing Univ. of Sci. & Technol., Kunming, China
Volume
9
fYear
2010
fDate
9-11 July 2010
Firstpage
432
Lastpage
435
Abstract
One of the many design and control issues of Automated Guided Vehicles System (AGVS) is the AGV fleet size. This paper presents a new solution method to determining the number of vehicles in the AGVS based on Flexible Manufacturing System (FMS). The approach relies on two procedures-estimate and simulation. With estimate procedure, the mathematic method will be used to estimate the AGV fleet size. In the next procedure, the estimate value will be used in the simulation model of AGVS for further study. The reliable number of vehicles can be reached after two procedures. The objective of this paper is to increase the efficiency and accuracy of the process in determining the AGV fleet size.
Keywords
automatic guided vehicles; flexible manufacturing systems; materials handling equipment; mathematical analysis; AGVS; FMS; automated guided vehicle fleet size; flexible manufacturing system; mathematic method; Automated guided vehicles system; Flexible manufacturing system; Number of vehicles; Simulation;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Science and Information Technology (ICCSIT), 2010 3rd IEEE International Conference on
Conference_Location
Chengdu
Print_ISBN
978-1-4244-5537-9
Type
conf
DOI
10.1109/ICCSIT.2010.5565147
Filename
5565147
Link To Document