• DocumentCode
    1960593
  • Title

    Industrial fabrication of superconducting accelerators

  • Author

    Dasbach, D. ; Fleck, R. ; Kiehlmann, D. ; Peiniger, M. ; Vogel, H.

  • Author_Institution
    Siemens AG, Bergisch Gladbach, Germany
  • fYear
    1993
  • fDate
    17-20 May 1993
  • Firstpage
    1080
  • Abstract
    During the last two years major progress has been achieved in the industrial production of superconducting accelerators. A technology program with CERN has been completed in order to transfer the technology to sputter niobium onto copper cavities. Several cavities have surpassed design values and series production for LEP 200 is in progress. Secondly a complete linac consisting of 2 single cell and 2 five cell accelerator modules has been designed and fabricated based on inhouse experience. All 4 modules have surpassed the design values (5 MV/m, Q>2×10 9, cryogenic losses ≈3 Watt) during tests at Siemens. All 4 modules are in the meanwhile delivered to JAERI. Details and recent results of the projects are presented
  • Keywords
    beam handling equipment; cavity resonators; niobium; LEP 200; Nb-Cu; cryogenic losses; five cell accelerator modules; industrial production; superconducting accelerators; Acceleration; Assembly; Coatings; Copper; Cryogenics; Fabrication; Production; Superconducting magnets; Testing; Textile industry;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1993., Proceedings of the 1993
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-1203-1
  • Type

    conf

  • DOI
    10.1109/PAC.1993.308677
  • Filename
    308677