• DocumentCode
    1963821
  • Title

    Progress of PLS 2-GeV linac

  • Author

    Namkung, W. ; Ko, I. ; Cho, M. ; Ryu, C. ; Bak, J. ; Nam, S. ; Lee, H.

  • Author_Institution
    Pohang Accel. Lab., Pohang, South Korea
  • fYear
    1993
  • fDate
    17-20 May 1993
  • Firstpage
    581
  • Abstract
    Pohang Accelerator Laboratory (PAL) is constructing the 2-GeV Pohang Light Source (PLS). The 2-GeV electron linear accelerator will be used as a full energy injector to the storage ring. There are 42 accelerating columns in the 150-m long linac. The linac is powered by 11 klystrons of 80-MW maximum output power, which are driven by 200-MW modulators. Two 200-MW modulators connected to the klystrons are already under normal operation, and assembly work for the nine remaining modulators is in progress. In the tunnel, about half of the linac has been installed. The cooling system is completed along with the precision temperature controllers. The installation work will be completed by the end of 1993. We present the updated construction progress of the PLS 2-GeV linac
  • Keywords
    beam handling techniques; electron accelerators; klystrons; linear accelerators; storage rings; 150 m; 2 GeV; 2-GeV Pohang Light Source; 200 MW; 80 MW; PAL; PLS 2-GeV linac; Pohang Accelerator Laboratory; accelerating columns; cooling system; electron linear accelerator; full energy injector; klystrons; maximum output power; modulators; precision temperature controllers; storage ring; Acceleration; Assembly; Electrons; Klystrons; Laboratories; Light sources; Linear accelerators; Linear particle accelerator; Power generation; Storage rings;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1993., Proceedings of the 1993
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-1203-1
  • Type

    conf

  • DOI
    10.1109/PAC.1993.308845
  • Filename
    308845