DocumentCode
1963821
Title
Progress of PLS 2-GeV linac
Author
Namkung, W. ; Ko, I. ; Cho, M. ; Ryu, C. ; Bak, J. ; Nam, S. ; Lee, H.
Author_Institution
Pohang Accel. Lab., Pohang, South Korea
fYear
1993
fDate
17-20 May 1993
Firstpage
581
Abstract
Pohang Accelerator Laboratory (PAL) is constructing the 2-GeV Pohang Light Source (PLS). The 2-GeV electron linear accelerator will be used as a full energy injector to the storage ring. There are 42 accelerating columns in the 150-m long linac. The linac is powered by 11 klystrons of 80-MW maximum output power, which are driven by 200-MW modulators. Two 200-MW modulators connected to the klystrons are already under normal operation, and assembly work for the nine remaining modulators is in progress. In the tunnel, about half of the linac has been installed. The cooling system is completed along with the precision temperature controllers. The installation work will be completed by the end of 1993. We present the updated construction progress of the PLS 2-GeV linac
Keywords
beam handling techniques; electron accelerators; klystrons; linear accelerators; storage rings; 150 m; 2 GeV; 2-GeV Pohang Light Source; 200 MW; 80 MW; PAL; PLS 2-GeV linac; Pohang Accelerator Laboratory; accelerating columns; cooling system; electron linear accelerator; full energy injector; klystrons; maximum output power; modulators; precision temperature controllers; storage ring; Acceleration; Assembly; Electrons; Klystrons; Laboratories; Light sources; Linear accelerators; Linear particle accelerator; Power generation; Storage rings;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location
Washington, DC
Print_ISBN
0-7803-1203-1
Type
conf
DOI
10.1109/PAC.1993.308845
Filename
308845
Link To Document