DocumentCode
2004979
Title
Investigation of accelerating erosion for bridge construction and its scour protection: 2D unsteady flow simulations for Taitung Bridge in Taiwan as case study
Author
Cheng, Kuei-Hsiang ; Lin, Chih-Hsien ; Teng, Wen-Kuang ; Chao, Cheng
Author_Institution
Dept. of Civil Eng., Kao Yuan Univ., Kaohsiung, Taiwan
fYear
2011
fDate
16-18 Sept. 2011
Firstpage
5316
Lastpage
5319
Abstract
According to the old bridge damaged emergency conversion program, this study investigates the flow changes during the coexistence of old and new bridge and contraction effect. The flow rate between piers increasing, thereby accelerating erosion. This study uses SMS-2D unsteady flow model to simulate old pier into the pre-construction setting due to their contraction flows and further necessary hydraulic structures and facilities for scour protection on the main deep trough of Taitung Bridge in 100 years return flood peak flow, on the downstream BeiNan River in Taiwan as case study, thus, providing reliable information and references for bridge engineers.
Keywords
bridges (structures); erosion; flow simulation; safety; structural engineering; 2D unsteady flow simulation; SMS-2D unsteady flow model; Taitung bridge; Taiwan; bridge construction; bridge engineer; bridge scour protection; contraction flow; damaged emergency conversion program; erosion acceleration; flood peak flow; Acceleration; Bridges; Cities and towns; Civil engineering; Educational institutions; Materials; Water resources; SMS-2D; accelerating erosion; bridge consctruction; scour protection;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical and Control Engineering (ICECE), 2011 International Conference on
Conference_Location
Yichang
Print_ISBN
978-1-4244-8162-0
Type
conf
DOI
10.1109/ICECENG.2011.6058488
Filename
6058488
Link To Document