DocumentCode
2043577
Title
Research on the BDAR Supporting Unit´s Scheduling Based on Interrupt Procedure
Author
Liu Fei ; Yang Jiangping ; Wang Hanzhong ; Tang, Tang
Author_Institution
Dept. of Land-based Early-Warning, AFRA, Wuhan
fYear
2009
fDate
23-24 May 2009
Firstpage
1
Lastpage
4
Abstract
During the BDAR (Battlefield Damage Assessment and Repair) Supporting Unit supports repairing the damage- equipments in multi-battlefield locales, some other locales may also ask for supporting. Aimed to the BDAR Supporting Unit´s scheduling problem of this dynamic battlefield, a scheduling method based on the interrupt procedure like in computer technology is proposed in this paper. This can guarantee the maximum fighting power recovery rate after each supporting repair to the damage-equipments. Furthermore, the repair interrupt priority determining method proposed in the paper also can be the criterion of the BDAR Supporting Unit deciding the supporting order of damage-equipments in multi-battlefield locales. And finally, this method is proved useful and feasible by an application example.
Keywords
maintenance engineering; military equipment; scheduling; BDAR supporting unit; battlefield damage assessment; battlefield damage repair; damaged equipment; dynamic battlefield; interrupt procedure; maximum fighting power recovery rate; multibattlefield locales; repair interrupt priority determining method; scheduling; Arithmetic; Bismuth; Dynamic scheduling; Genetic algorithms; Military computing; Processor scheduling; Surveillance;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Systems and Applications, 2009. ISA 2009. International Workshop on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-3893-8
Electronic_ISBN
978-1-4244-3894-5
Type
conf
DOI
10.1109/IWISA.2009.5073085
Filename
5073085
Link To Document