    Design criteria and levelized costs of electricity for photovoltaic power plants at different global locations

  • Author

    Knorr, Romy

  • Author_Institution
    IIA CE SE R&D PE, Siemens AG, Chemnitz, Germany
  • fYear
    2012
  • fDate
    20-23 March 2012
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    This research deals with design criteria for photovoltaic power plants at different global locations. The ground-mounted systems with an installed power greater than 500 kW are equipped with central inverters and located in the countries of Italy, Canada, Israel, Libya and China. The analysis focuses the effects of ambient temperature and radiation on the behavior of the overall system, as well as of the individual system components and of the electricity production costs of defined photovoltaic power plants. For the economic analysis the content of the feed in tariff and the resulting proceeds are to be considered.
  • Keywords
    photovoltaic power systems; power markets; tariffs; ambient temperature; central inverters; electricity levelized cost; electricity production costs; ground-mounted systems; photovoltaic power plants; tariff; Electricity; Inverters; Investments; Photovoltaic systems; Production; LCOE; PV power plant; electricity production costs; over-sizing; photovoltaic;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Signals and Devices (SSD), 2012 9th International Multi-Conference on
  • Conference_Location
    Chemnitz
  • Print_ISBN
    978-1-4673-1590-6
  • Electronic_ISBN
    978-1-4673-1589-0
  • Type

    conf

  • DOI
    10.1109/SSD.2012.6197972
  • Filename
    6197972