DocumentCode
2078054
Title
DEA and TOPSIS combination model for the construction scheduling of urban road projects
Author
Meng, Meng ; Chun-fu Shao
Author_Institution
MOE Key Lab. for Transp. Complex, Beijing Jiaotong Univ., Beijing, China
fYear
2011
fDate
16-18 Dec. 2011
Firstpage
1937
Lastpage
1940
Abstract
The construction scheduling of urban road projects is a typical multiple stage and multiple attribute decision making problem. To improve the availability of the urban road planning and construction, a model with multiple stage and multiple attribute is proposed, which is based on the DEA and TOPSIS. The DEA method is used to calculate each DMU´s relative efficiency, then the TOPSIS method is used to rank the relative efficiency, and the urban road construction sequence is obtained accordingly. In this model, the advantages of the DEA´s superiority of evaluating with multiple inputs and outputs indicators and the TOPSIS´s systematicness and comprehensiveness are utilized. And the shortcoming of the DEA´s failure to rank all projects is avoided, which provides a new approach to this problem. Finally, an example is presented to illustrate the effectiveness of the proposed method.
Keywords
construction; data envelopment analysis; decision making; roads; scheduling; transportation; DEA; TOPSIS; combination model; construction scheduling; multiple attribute decision making problem; multiple stage decision making problem; urban road construction; urban road planning; urban road projects; Analytical models; Computational modeling; Decision making; Indexes; Investments; Roads; DEA; TOPSIS; construction sequence; traffic engineering; urban road;
fLanguage
English
Publisher
ieee
Conference_Titel
Transportation, Mechanical, and Electrical Engineering (TMEE), 2011 International Conference on
Conference_Location
Changchun
Print_ISBN
978-1-4577-1700-0
Type
conf
DOI
10.1109/TMEE.2011.6199593
Filename
6199593
Link To Document