• DocumentCode
    2101526
  • Title

    Long distance transmission line with controlled shunt reactors (CSRT)

  • Author

    Alexandrov, G.N. ; Dardeer, Mostafa M.

  • Author_Institution
    St.-Petersburg State Polytech. Univ., St. Petersburg
  • fYear
    2008
  • fDate
    12-15 March 2008
  • Firstpage
    294
  • Lastpage
    299
  • Abstract
    In this paper the power transmission line from hydro-power station at rapids of the river Congo to Egypt (4500 km) is considered. It is shown that the main problem of the electric energy transmission over long line is connected with a compensation of surplus reactive power of line. Three different variants for this line are presented in this paper with regulated shunt compensation in accordance with transmitted power over the line. For this purpose controlled shunt reactors of a transformer type (CSRT) are used. A mode of voltage by any transmitted power over the line is considered - from no load to natural mode of transmitted power.
  • Keywords
    power transmission lines; controlled shunt reactors; long distance transmission line; power transmission line; Electric resistance; Inductors; Power transmission lines; Reactive power; Reactive power control; Rivers; Shunt (electrical); Substations; Transmission lines; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power System Conference, 2008. MEPCON 2008. 12th International Middle-East
  • Conference_Location
    Aswan
  • Print_ISBN
    978-1-4244-1933-3
  • Electronic_ISBN
    978-1-4244-1934-0
  • Type

    conf

  • DOI
    10.1109/MEPCON.2008.4562371
  • Filename
    4562371