DocumentCode
2101526
Title
Long distance transmission line with controlled shunt reactors (CSRT)
Author
Alexandrov, G.N. ; Dardeer, Mostafa M.
Author_Institution
St.-Petersburg State Polytech. Univ., St. Petersburg
fYear
2008
fDate
12-15 March 2008
Firstpage
294
Lastpage
299
Abstract
In this paper the power transmission line from hydro-power station at rapids of the river Congo to Egypt (4500 km) is considered. It is shown that the main problem of the electric energy transmission over long line is connected with a compensation of surplus reactive power of line. Three different variants for this line are presented in this paper with regulated shunt compensation in accordance with transmitted power over the line. For this purpose controlled shunt reactors of a transformer type (CSRT) are used. A mode of voltage by any transmitted power over the line is considered - from no load to natural mode of transmitted power.
Keywords
power transmission lines; controlled shunt reactors; long distance transmission line; power transmission line; Electric resistance; Inductors; Power transmission lines; Reactive power; Reactive power control; Rivers; Shunt (electrical); Substations; Transmission lines; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Power System Conference, 2008. MEPCON 2008. 12th International Middle-East
Conference_Location
Aswan
Print_ISBN
978-1-4244-1933-3
Electronic_ISBN
978-1-4244-1934-0
Type
conf
DOI
10.1109/MEPCON.2008.4562371
Filename
4562371
Link To Document