DocumentCode
2105128
Title
The analysis of liability risk allocation for Integrated Project Delivery
Author
Zhang, Lianying ; Chen, Wenfeng
Author_Institution
School of Management, Tianjin University, China
fYear
2010
fDate
4-6 Dec. 2010
Firstpage
3204
Lastpage
3207
Abstract
Integrated Project Delivery (IPD) build a model to improve project outcomes through a collaborative approach and a multi-party agreement. But IPD is short of mature laws and system like liability allocation and risk control. Thus the overall objective of this study is to make a research and discuss into the risk liability allocation problems, where basic risk allocation problems are discussed and effective mechanisms are summarized in this paper. Risk/profit sharing mechanism and liability harbor mechanism are proposed to improve the rationalization and available of IPD. And insurance coverage should be an effective complement in the actual project of construction.
Keywords
Instruments; Kernel; Optimization; Privacy; Resource management; Security; Building Information Modeling; Integrated Project Delivery; Liability Risk Allocation;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location
Hangzhou, China
Print_ISBN
978-1-4244-7616-9
Type
conf
DOI
10.1109/ICISE.2010.5689527
Filename
5689527
Link To Document