• DocumentCode
    2105128
  • Title

    The analysis of liability risk allocation for Integrated Project Delivery

  • Author

    Zhang, Lianying ; Chen, Wenfeng

  • Author_Institution
    School of Management, Tianjin University, China
  • fYear
    2010
  • fDate
    4-6 Dec. 2010
  • Firstpage
    3204
  • Lastpage
    3207
  • Abstract
    Integrated Project Delivery (IPD) build a model to improve project outcomes through a collaborative approach and a multi-party agreement. But IPD is short of mature laws and system like liability allocation and risk control. Thus the overall objective of this study is to make a research and discuss into the risk liability allocation problems, where basic risk allocation problems are discussed and effective mechanisms are summarized in this paper. Risk/profit sharing mechanism and liability harbor mechanism are proposed to improve the rationalization and available of IPD. And insurance coverage should be an effective complement in the actual project of construction.
  • Keywords
    Instruments; Kernel; Optimization; Privacy; Resource management; Security; Building Information Modeling; Integrated Project Delivery; Liability Risk Allocation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Science and Engineering (ICISE), 2010 2nd International Conference on
  • Conference_Location
    Hangzhou, China
  • Print_ISBN
    978-1-4244-7616-9
  • Type

    conf

  • DOI
    10.1109/ICISE.2010.5689527
  • Filename
    5689527