• DocumentCode
    2124548
  • Title

    Memetic Algorithm for Solving Construction Time-Cost Optimization

  • Author

    Li Huimin ; Wang Zhuofu

  • Author_Institution
    Inst. of Constr. Project Manage., Hohai Univ., Nanjing, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The time-cost optimization (TCO) problem is a multiobjective optimization problem, which attempts to strike a balance between resource allocation costs and project schedule duration. In this paper, memetic algorithm (MA) which uses order crossover and a new mutation based on neighborhood search after each crossover and mutation operation, and an improved simulated annealing algorithm utilized for local search, is employed to model time-cost optimization problem. A prototype example using MA for TCO problem is simulated with Matlab7.0. The test results show that the MA based model can generate a more optimal cost under the same duration and achieve a better Pareto front than other models. Therefore, the MA can be regarded as a useful approach for solving construction project TCO problems.
  • Keywords
    construction industry; project management; resource allocation; simulated annealing; Matlab7.0; Pareto front models; construction project; memetic algorithm; multiobjective optimization problem; project schedule duration; resource allocation costs; simulated annealing algorithm; time-cost optimization problem; Cost function; Cultural differences; Evolution (biology); Genetic mutations; Mathematical model; Project management; Resource management; Scheduling algorithm; Simulated annealing; Stochastic processes;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5302956
  • Filename
    5302956