• DocumentCode
    2131650
  • Title

    Optimization Algorithm of Resources Limited and Time Least in Construction Project Management

  • Author

    Li, Lan

  • Author_Institution
    Dept. of Investment & Manage. in Eng., Dongbei Univ. of Finance & Econ., Dalian, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Resource optimization is an important content of project construction planning. As in some period resources required are more than resources available, construction planning has to be adjusted to satisfy resource restriction and not to delay the time or to get the least deferment. This paper presents the UTM algorithm for time parameters of construction schedule planning network diagram and resources optimization algorithm for "resources limited and time least", realizes rapid optimization computing with computer, and verifies validity of the algorithm by example.
  • Keywords
    construction industry; optimisation; planning; project management; construction project management; construction schedule planning network diagram; project construction planning; resource optimization; resource restriction; resources optimization algorithm; Computer networks; Content management; Engineering management; Financial management; Investments; Processor scheduling; Project management; Resource management; Scheduling algorithm; Turing machines;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5303213
  • Filename
    5303213