• DocumentCode
    2142640
  • Title

    Project integrated management based on quality earned value

  • Author

    Xu, Jiyao ; Zhang, Hengquan ; Li, Feixiang

  • Author_Institution
    Management Science and Engineering, Business School, Hohai University, HHU, Nanjing, China
  • fYear
    2010
  • fDate
    4-6 Dec. 2010
  • Firstpage
    432
  • Lastpage
    435
  • Abstract
    Aiming at the problems of the traditional earned value method widely used currently, this article established a quality earned value model, and built up the project quality evaluation system, considering the quality factor. This model can improve and perfect the existing Earned Value, and coordinate the three project control objectives, quality, cost and schedule, based on fuzzy membership. It can comprehensively measure and reflect the actual situation of the overall project progress, thus ensuring integrated management of the project objectives of quality, cost and schedule.
  • Keywords
    Indexes; Inspection; Project management; Q factor; Quality assessment; Schedules; fuzzy membership; integrated management; project management; quality earned value;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Science and Engineering (ICISE), 2010 2nd International Conference on
  • Conference_Location
    Hangzhou, China
  • Print_ISBN
    978-1-4244-7616-9
  • Type

    conf

  • DOI
    10.1109/ICISE.2010.5690973
  • Filename
    5690973