DocumentCode
2142640
Title
Project integrated management based on quality earned value
Author
Xu, Jiyao ; Zhang, Hengquan ; Li, Feixiang
Author_Institution
Management Science and Engineering, Business School, Hohai University, HHU, Nanjing, China
fYear
2010
fDate
4-6 Dec. 2010
Firstpage
432
Lastpage
435
Abstract
Aiming at the problems of the traditional earned value method widely used currently, this article established a quality earned value model, and built up the project quality evaluation system, considering the quality factor. This model can improve and perfect the existing Earned Value, and coordinate the three project control objectives, quality, cost and schedule, based on fuzzy membership. It can comprehensively measure and reflect the actual situation of the overall project progress, thus ensuring integrated management of the project objectives of quality, cost and schedule.
Keywords
Indexes; Inspection; Project management; Q factor; Quality assessment; Schedules; fuzzy membership; integrated management; project management; quality earned value;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location
Hangzhou, China
Print_ISBN
978-1-4244-7616-9
Type
conf
DOI
10.1109/ICISE.2010.5690973
Filename
5690973
Link To Document