• DocumentCode
    2152658
  • Title

    Multiple project scheduling based on an improved hybrid genetic algorithm

  • Author

    Zhu, Fangwei ; Song, Bin

  • Author_Institution
    School of Management, Dalian University of Technology, DUT, China
  • fYear
    2010
  • fDate
    4-6 Dec. 2010
  • Firstpage
    351
  • Lastpage
    354
  • Abstract
    This paper proposes a hybrid genetic algorithm to solve the resource-constrained multiple project scheduling problem. Objective described in this paper is to minimize total project time. The paper firstly analyses multi-task of many resources in a group of projects, and sets up the mathematics model. Then it brings an improved genetic algorithm, and changes the problem into the chromosome or the sequence of genes with the corresponding priority. The corresponding algorithm is proposed to optimize the objective of time. Finally, this paper gives an example to show the application.
  • Keywords
    Algorithm design and analysis; Biological cells; Genetics; Job shop scheduling; Mathematical model; Schedules; hybrid genetic algorithm; resource-constrained multiple project scheduling problem; scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Science and Engineering (ICISE), 2010 2nd International Conference on
  • Conference_Location
    Hangzhou, China
  • Print_ISBN
    978-1-4244-7616-9
  • Type

    conf

  • DOI
    10.1109/ICISE.2010.5691434
  • Filename
    5691434