DocumentCode
2161771
Title
Assessment of Agent System Project Risk Based on Entropy Method
Author
Sun Shao-nan ; Nie Xiang-tian
Author_Institution
Sch. of Water-Conservancy, North China Univ. of Water Resources & Electr. Power, Zhengzhou, China
fYear
2010
fDate
24-26 Aug. 2010
Firstpage
1
Lastpage
4
Abstract
Agent construction system is a new project management mode to meet the need of modern engineering construction, and is an innovation of government-invested engineering management mode. There are some positive aspects and some risks during the implementation .This paper analyses the risk factors based on the characteristics of agent management projects, establishes risk index system, using Entropy measurement to calculate the risk degrees , Finally, it gives an example to show how to use this method. This paper sets up an reasonable and effectively method for risk management of agent management projects.
Keywords
entropy; government; project management; risk management; agent construction system; agent system project risk; entropy measurement; entropy method; government-invested engineering management; modern engineering construction; project management; risk factors; risk index system; Construction industry; Entropy; Force; Indexes; Project management; Thermodynamics; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Management and Service Science (MASS), 2010 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-5325-2
Electronic_ISBN
978-1-4244-5326-9
Type
conf
DOI
10.1109/ICMSS.2010.5576735
Filename
5576735
Link To Document