• DocumentCode
    2161771
  • Title

    Assessment of Agent System Project Risk Based on Entropy Method

  • Author

    Sun Shao-nan ; Nie Xiang-tian

  • Author_Institution
    Sch. of Water-Conservancy, North China Univ. of Water Resources & Electr. Power, Zhengzhou, China
  • fYear
    2010
  • fDate
    24-26 Aug. 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Agent construction system is a new project management mode to meet the need of modern engineering construction, and is an innovation of government-invested engineering management mode. There are some positive aspects and some risks during the implementation .This paper analyses the risk factors based on the characteristics of agent management projects, establishes risk index system, using Entropy measurement to calculate the risk degrees , Finally, it gives an example to show how to use this method. This paper sets up an reasonable and effectively method for risk management of agent management projects.
  • Keywords
    entropy; government; project management; risk management; agent construction system; agent system project risk; entropy measurement; entropy method; government-invested engineering management; modern engineering construction; project management; risk factors; risk index system; Construction industry; Entropy; Force; Indexes; Project management; Thermodynamics; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science (MASS), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-5325-2
  • Electronic_ISBN
    978-1-4244-5326-9
  • Type

    conf

  • DOI
    10.1109/ICMSS.2010.5576735
  • Filename
    5576735