• DocumentCode
    2163507
  • Title

    Multiple capacity single vehicle job scheduling for AGV´s

  • Author

    Langer, J. ; Sagar, V.K.

  • Author_Institution
    Essex Univ., Colchester, UK
  • fYear
    1994
  • fDate
    5-9 Sep 1994
  • Firstpage
    348
  • Lastpage
    353
  • Abstract
    Although job scheduling for automated guided vehicle (AGV) systems has hardly been investigated, it is a very important problem as it is highly decisive for the performance of such a system. Current solutions focus on the simple case of vehicles loading only one unit at a time. However the introduction of multiple capacity vehicles increases the need for more general solutions. A heuristic optimisation criterion for the problem of a multiple capacity vehicle is proposed, an appropriate algorithm presented and illustrated, and an idea of further research in this field is given
  • Keywords
    automatic guided vehicles; optimisation; production control; scheduling; AGV; automated guided vehicle; heuristic optimisation; job scheduling; multiple capacity vehicles; production control;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Intelligent Systems Engineering, 1994., Second International Conference on
  • Conference_Location
    Hamburg-Harburg
  • Print_ISBN
    0-85296-621-0
  • Type

    conf

  • DOI
    10.1049/cp:19940649
  • Filename
    332016