DocumentCode
2163507
Title
Multiple capacity single vehicle job scheduling for AGV´s
Author
Langer, J. ; Sagar, V.K.
Author_Institution
Essex Univ., Colchester, UK
fYear
1994
fDate
5-9 Sep 1994
Firstpage
348
Lastpage
353
Abstract
Although job scheduling for automated guided vehicle (AGV) systems has hardly been investigated, it is a very important problem as it is highly decisive for the performance of such a system. Current solutions focus on the simple case of vehicles loading only one unit at a time. However the introduction of multiple capacity vehicles increases the need for more general solutions. A heuristic optimisation criterion for the problem of a multiple capacity vehicle is proposed, an appropriate algorithm presented and illustrated, and an idea of further research in this field is given
Keywords
automatic guided vehicles; optimisation; production control; scheduling; AGV; automated guided vehicle; heuristic optimisation; job scheduling; multiple capacity vehicles; production control;
fLanguage
English
Publisher
iet
Conference_Titel
Intelligent Systems Engineering, 1994., Second International Conference on
Conference_Location
Hamburg-Harburg
Print_ISBN
0-85296-621-0
Type
conf
DOI
10.1049/cp:19940649
Filename
332016
Link To Document