Construction of Risk Management Construction-Agent Model Based on Factor Analysis-BP Neural Network
Author
Sun Xuntao ; Chen Deyi
Author_Institution
Qingdao Economic & Tech. Dev. Zone, Tourism Dev. Co., Ltd., Qingdao, China
fYear
2010
fDate
24-26 Aug. 2010
Firstpage
1
Lastpage
6
Abstract
On the basis of the risk evaluation index system used for the decomposition of a governmental project of Construction-Agent work, this article proposes to establish a Construction-Agent project risk assessment model based on factor analysis-BP neural network and points out the basic ideas and steps of model-building after analyzing the strengthens and weaknesses of fuzzy comprehensive evaluation model commonly used for risk management.
Keywords
backpropagation; government; neural nets; risk management; BP neural network; construction-agent project; factor analysis; fuzzy comprehensive evaluation model; governmental project; risk assessment model; risk evaluation index system; risk management construction-agent model; Analytical models; Artificial neural networks; Biological system modeling; Construction industry; Indexes; Mathematical model; Risk management;
fLanguage
English
Publisher
ieee
Conference_Titel
Management and Service Science (MASS), 2010 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-5325-2
Electronic_ISBN
978-1-4244-5326-9
Type
conf
DOI
10.1109/ICMSS.2010.5576859
Filename
5576859
Link To Document