DocumentCode
2167826
Title
Project risk simulation under uncertain construction duration
Author
Hsu, Kun-Jung
Author_Institution
Dept. of Constr. Technol., Leader Univ., Tainan, Taiwan
Volume
2
fYear
2004
fDate
5-8 Dec. 2004
Firstpage
1277
Abstract
This paper establishes a two-phase model to explore the financial risk of construction project under uncertain construction duration. Treated as a random variable in the model, the construction duration affects the random present worth of cash flow in both construction and operation phases. An illustration of BOT project under uncertain construction duration was utilized for simulation. The simulation result was applied to reveal how uncertain construction duration affects project risk. The paper also shows how the standard deviation of the NPV increases whenever the variance of construction duration rises, thus accentuating the contingency of the project. The results´ analysis extended to the discussion of its effect on the probability of negative NPV and its theoretical meanings.
Keywords
construction; financial management; probability; project management; risk analysis; BOT project; cash flow; construction phase; construction project; financial risk; operation phase; project risk simulation; standard deviation; two-phase model; uncertain construction duration; Contracts; Costs; Delay effects; Finance; Integral equations; Investments; Probability distribution; Project management; Random variables; Risk analysis;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference, 2004. Proceedings of the 2004 Winter
Print_ISBN
0-7803-8786-4
Type
conf
DOI
10.1109/WSC.2004.1371460
Filename
1371460
Link To Document