DocumentCode
2179812
Title
Contracting resources for manufacturing tasks
Author
Ramos, Carlos
fYear
1994
fDate
25-27 May 1994
Firstpage
286
Lastpage
291
Abstract
This paper deals with a new architecture and negotiation protocol for the dynamic scheduling of manufacturing systems. The architecture is based on the paradigm of distributed intelligence and multi-agent systems. In what concerns the architecture, this paper has two original contributions: the existence of agents representing tasks together with agents representing resources; and the important role of the resource manager agent. A new negotiation protocol for manufacturing systems is also presented in this paper. The purpose of this protocol is to dynamically assign operations to the resources of the manufacturing system in order to accomplish the proposed tasks. This protocol involves a renegotiation phase whenever exceptions appear
Keywords
manufacturing computer control; production control; protocols; resource allocation; MAP; architecture; distributed intelligence; dynamic scheduling; manufacturing systems; multi-agent systems; negotiation protocol; operations assignment; resource contracting; resource management; Artificial intelligence; Distributed computing; Dynamic scheduling; Intelligent manufacturing systems; Intelligent robots; Manufacturing systems; Multiagent systems; Problem-solving; Protocols; Robot kinematics;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Electronics, 1994. Symposium Proceedings, ISIE '94., 1994 IEEE International Symposium on
Conference_Location
Santiago
Print_ISBN
0-7803-1961-3
Type
conf
DOI
10.1109/ISIE.1994.333103
Filename
333103
Link To Document