• DocumentCode
    2201727
  • Title

    Design and analysis of a dynamic scheduler for a flexible assembly system

  • Author

    Huang, Tz-Shian ; Fu, Li-Chen ; Chen, Yung-Yu

  • Author_Institution
    Dept. of Comput. Sci. & Inf. Eng., Nat. Taiwan Univ., Taipei, Taiwan
  • Volume
    4
  • fYear
    1997
  • fDate
    20-25 Apr 1997
  • Firstpage
    3334
  • Abstract
    This paper proposes a rule-based dynamic scheduler for a flexible assembly system. We first introduce a flexible control system developed by the Intelligent Robot and Automation Laboratory in National Taiwan University. Based on that control system, the relationship between the control system and the scheduler is characterized. With focus on realization, hardware limitations such as long computation time and excessive memory-space usage are relaxed by incorporating several heuristic measures. The present work is applied to the simulated robotized flexible assembly system in our laboratory
  • Keywords
    assembling; flexible manufacturing systems; industrial robots; inference mechanisms; knowledge based systems; object-oriented methods; production control; robots; search problems; flexible assembly system; flexible control system; hardware limitations; long computation time; memory-space usage; realization; robotized flexible assembly system; rule-based dynamic scheduler; Assembly systems; Automatic control; Control systems; Dynamic scheduling; Hardware; Intelligent robots; Laboratories; Processor scheduling; Robotic assembly; Robotics and automation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1997. Proceedings., 1997 IEEE International Conference on
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    0-7803-3612-7
  • Type

    conf

  • DOI
    10.1109/ROBOT.1997.606797
  • Filename
    606797