DocumentCode
2202194
Title
Interconnection testing of distributed resources
Author
Kroposki, Benjamin ; Basso, Thomas ; DeBlasio, Richard
Author_Institution
Nat. Renewable Energy Lab., Golden, CO
fYear
2004
fDate
10-10 June 2004
Firstpage
1892
Abstract
With the publication of IEEE 1547-2003 standard for interconnecting distributed resources with electric power systems, the electric power industry has a need to develop tests and procedures for verifying that interconnection equipment meets the technical requirements. A new standard IEEE P1547.1 is being written that will give detailed tests and procedures for confirming that equipment meets the interconnection requirements. The National Renewable Energy Laboratory has been validating new test procedures that are being developed as part of IEEE P1547.1. As work progresses on the validation of the procedures, information and test reports are passed on to the working group of IEEE P1547.1 for changes to future revisions
Keywords
IEEE standards; distributed power generation; distribution networks; electricity supply industry; power system interconnection; power system transients; synchronous generators; test equipment; IEEE 1547-2003 standard; National Renewable Energy Laboratory; dispersed generation; dispersed storage; distributed resources; electric power industry; electric power systems; interconnection equipment; interconnection testing; power system testing; power system transients; synchronous generators; Laboratories; Power generation; Power system interconnection; Power system reliability; Power systems; Renewable energy resources; Standards development; Synchronous generators; System testing; USA Councils;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2004. IEEE
Conference_Location
Denver, CO
Print_ISBN
0-7803-8465-2
Type
conf
DOI
10.1109/PES.2004.1373208
Filename
1373208
Link To Document