• DocumentCode
    2221858
  • Title

    Research on Optimization for Balance of BSP Model Assembly Line Based on Flexsim

  • Author

    Anhua, Ge ; Yuqiao, Zhang

  • Author_Institution
    Coll. of Eng. Technol., Northeast Forestry Univ., Harbin, China
  • Volume
    2
  • fYear
    2010
  • fDate
    26-28 Nov. 2010
  • Firstpage
    272
  • Lastpage
    276
  • Abstract
    The assembly line exists widely in manufacturing systems. The problems of assembly line balance directly affect the productivity of manufacturing systems. The paper is focused on assembly line for BSP models of a company, balance for which is to be improved through industrial engineering methods. Balance of the assembly line is studied by system simulation technology. By using Simulation - Balance - Simulation method, comparative analysis on the important indicator and station utilization before and after the balance is carried out, so as to achieve balanced processes load, improve assembly line balancing rate, reduce waste and production costs.
  • Keywords
    assembling; cost reduction; digital simulation; industrial engineering; manufacturing systems; production engineering computing; waste reduction; BSP model assembly line; Flexsim; assembly line balancing rate; comparative analysis; industrial engineering method; manufacturing system productivity; production cost reduction; simulation-balance-simulation method; station utilization; system simulation technology; waste reduction; assembly line balancing; balance improvement; industrial engineering; system simulation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Management, Innovation Management and Industrial Engineering (ICIII), 2010 International Conference on
  • Conference_Location
    Kunming
  • Print_ISBN
    978-1-4244-8829-2
  • Type

    conf

  • DOI
    10.1109/ICIII.2010.230
  • Filename
    5694569