• DocumentCode
    2231728
  • Title

    Scheduling Semiconductor Manufacturing Plants to Reduce Mean and Variance of Cycle-Time

  • Author

    Lu, Steve C H ; Ramaswamy, Deepa ; Kumar, P.R.

  • Author_Institution
    University of Illinois
  • fYear
    1993
  • fDate
    18-19 Oct 1993
  • Firstpage
    83
  • Lastpage
    85
  • Keywords
    Fabrication; Fluctuations; Job shop scheduling; Manufacturing systems; Semiconductor device manufacture; Semiconductor device testing; Smoothing methods; System testing; Traffic control; Virtual manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Semiconductor Manufacturing Conference and Workshop, 1993. ASMC 93 Proceedings. IEEE/SEMI
  • Type

    conf

  • DOI
    10.1109/ASMC.1993.682485
  • Filename
    682485