Abstract
This paper considers a type of project scheduling problem with objective of minimizing the total cost, in which project activities have fuzzy duration times and loan is taken into account in the total cost. According to some optimization goal, a fuzzy chance-constrained programming is built to model the project scheduling problem. Moreover, the technique of fuzzy simulation and genetic algorithm are integrated to design a hybrid intelligent algorithm to solve the fuzzy model. Finally, a simple numerical example is given to illustrate the effectiveness of the algorithm.
Keywords
constraint handling; cost accounting; fuzzy set theory; genetic algorithms; minimisation; scheduling; fuzzy activity duration times; fuzzy chance constrained programming; fuzzy model; fuzzy simulation technique; genetic algorithm; hybrid intelligent algorithm design; optimization; project scheduling problem; total cost minimisation; Algorithm design and analysis; Availability; Cost function; Fuzzy set theory; Genetic algorithms; Probability distribution; Resource management; Scheduling algorithm; Stochastic processes; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Fuzzy Systems, 2004. Proceedings. 2004 IEEE International Conference on
ISSN
1098-7584
Print_ISBN
0-7803-8353-2
Type
conf
DOI
10.1109/FUZZY.2004.1375507
Filename
1375507
Link To Document