• DocumentCode
    2247731
  • Title

    Largest-job-first-scan-all scheduling policy for 2D mesh-connected systems

  • Author

    Yoo, Seong-Moo ; Yong Youn, Hee

  • Author_Institution
    Dept. of Comput. Sci., Colorado State Univ., Fort Collins, CO, USA
  • fYear
    1996
  • fDate
    27-31 Oct 1996
  • Firstpage
    118
  • Lastpage
    125
  • Abstract
    In general parallel computer systems, scheduling incoming jobs has been identified to be an important factor determining the overall performance, in addition to the allocation of processors to the scheduled jobs. The authors propose an efficient scheduling scheme for two-dimensional meshes. By employing the largest job first and scan-all policy along with the waiting time limit, the proposed scheme can alleviate the fragmentation problem. Contrary to the previous largest-job-first scheduling schemes, large jobs do not block small jobs in the scheme. As a result, the mean response time is significantly reduced as identified by comprehensive computer simulation
  • Keywords
    multiprocessor interconnection networks; parallel machines; processor scheduling; virtual machines; 2D mesh-connected systems; computer simulation; fragmentation problem; largest-job-first-scan-all scheduling policy; mean response time; parallel computer systems; performance; processor allocation; scheduled jobs; scheduling incoming jobs; waiting time limit; Computer science; Computer simulation; Concurrent computing; Delay; Distributed computing; Processor scheduling; Scattering; System performance; Topology;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Frontiers of Massively Parallel Computing, 1996. Proceedings Frontiers '96., Sixth Symposium on the
  • Conference_Location
    Annapolis, MD
  • ISSN
    1088-4955
  • Print_ISBN
    0-8186-7551-9
  • Type

    conf

  • DOI
    10.1109/FMPC.1996.558068
  • Filename
    558068