DocumentCode
2249086
Title
Predictive scheduling for permutation flow shop subject to new arrival job
Author
Xingbao, Han ; Bing, Wang ; Yabing, Nie
Author_Institution
School of Mechatronic Engineering and Automation, Shanghai University, Shanghai 200072, P.R. China
fYear
2015
fDate
28-30 July 2015
Firstpage
2732
Lastpage
2737
Abstract
This paper discusses a predictive scheduling for permutation flow shop problem subject to new arrival job. We developed a predictive schedule method to absorb the effect caused by the new arrival job by inserting moderate slack times into the initial schedule. Considering the idle time existed in the initial schedule, we introduced how to insert slack times according to the occurrence probability of new job to optimize the objective combining efficiency and stability. Extensive experiments have been conducted and the computational results demonstrate that the proposed predictive scheduling method can improve the schedule stability significantly with little sacrifice of efficiency.
Keywords
Conferences; Job shop scheduling; Processor scheduling; Schedules; Single machine scheduling; Uncertainty; insert slack time; new arrival job; permutation flow shop; predictive scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Control Conference (CCC), 2015 34th Chinese
Conference_Location
Hangzhou, China
Type
conf
DOI
10.1109/ChiCC.2015.7260056
Filename
7260056
Link To Document