DocumentCode
2265894
Title
Equipment buffering strategy to maximize productivity
Author
Subramaniam, B. ; Pillai, D.
fYear
2003
fDate
30 Sept.-2 Oct. 2003
Firstpage
329
Lastpage
332
Abstract
In the infancy of 300mm, I300I and J300 adopted a cost-effective 1+1 loadport buffering for most tools with a few exceptions (litho link, implant) where the run-rate and expected utilization of the tool motivated a larger buffer. Metrology tools, inspite of their very high run-rates, were to follow the standard 1+1 configuration due to the cost and footprint impact of additional loadports relative to the expected average utilization. 300mm production experience has shown the need for burst capacity on these tools. This paper explores ways to improve productivity of these tools without compromising cost or footprint goals.
Keywords
costing; integrated circuit manufacture; optimised production technology; production equipment; production planning; productivity; 300 mm; cost effectiveness; loadport buffering; metrology tools; production experience; production improvement; productivity; Costs; Guidelines; Implants; Inventory management; Manufacturing processes; Production; Productivity; Proposals; Robotics and automation; Service robots;
fLanguage
English
Publisher
ieee
Conference_Titel
Semiconductor Manufacturing, 2003 IEEE International Symposium on
ISSN
1523-553X
Print_ISBN
0-7803-7894-6
Type
conf
DOI
10.1109/ISSM.2003.1243294
Filename
1243294
Link To Document