• DocumentCode
    2265894
  • Title

    Equipment buffering strategy to maximize productivity

  • Author

    Subramaniam, B. ; Pillai, D.

  • fYear
    2003
  • fDate
    30 Sept.-2 Oct. 2003
  • Firstpage
    329
  • Lastpage
    332
  • Abstract
    In the infancy of 300mm, I300I and J300 adopted a cost-effective 1+1 loadport buffering for most tools with a few exceptions (litho link, implant) where the run-rate and expected utilization of the tool motivated a larger buffer. Metrology tools, inspite of their very high run-rates, were to follow the standard 1+1 configuration due to the cost and footprint impact of additional loadports relative to the expected average utilization. 300mm production experience has shown the need for burst capacity on these tools. This paper explores ways to improve productivity of these tools without compromising cost or footprint goals.
  • Keywords
    costing; integrated circuit manufacture; optimised production technology; production equipment; production planning; productivity; 300 mm; cost effectiveness; loadport buffering; metrology tools; production experience; production improvement; productivity; Costs; Guidelines; Implants; Inventory management; Manufacturing processes; Production; Productivity; Proposals; Robotics and automation; Service robots;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing, 2003 IEEE International Symposium on
  • ISSN
    1523-553X
  • Print_ISBN
    0-7803-7894-6
  • Type

    conf

  • DOI
    10.1109/ISSM.2003.1243294
  • Filename
    1243294