• DocumentCode
    2272468
  • Title

    Simulation of the defect removal process with queuing theory

  • Author

    Wang Fan ; Yang Xiaohu ; Zhu Xiaochun ; Chen Lu

  • Author_Institution
    Coll. of Comput. Sci., Zhejiang Univ., Hangzhou, China
  • fYear
    2009
  • fDate
    15-16 Oct. 2009
  • Firstpage
    473
  • Lastpage
    476
  • Abstract
    In this paper, we simulate the defects removal process using finite independent queues with different capacity and loading, which represent the limitation of developers and the ability differences of developers. The re-assignment strategy used in defects removal represents the cooperation between relevant developers. Experimental results based on real data show that the simulated approach can provide very useful and important information which can help project manager to estimate the duration of the whole defects removal process, the utilization of each developers and the defects remain at a specific time.
  • Keywords
    digital simulation; queueing theory; software reliability; defect removal process simulation; finite independent queues; queuing theory; Computational modeling; Computer simulation; Educational institutions; Mathematical model; Predictive models; Project management; Queueing analysis; Software engineering; Software measurement; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Empirical Software Engineering and Measurement, 2009. ESEM 2009. 3rd International Symposium on
  • Conference_Location
    Lake Buena Vista, FL
  • ISSN
    1938-6451
  • Print_ISBN
    978-1-4244-4842-5
  • Electronic_ISBN
    1938-6451
  • Type

    conf

  • DOI
    10.1109/ESEM.2009.5316005
  • Filename
    5316005