DocumentCode
2287492
Title
The megajoule project power conditioning CEA-project
Author
Marret, J.P. ; De Cervens, D. Rubin
Author_Institution
CEA, Centre d´´Etudes de Bruyeres-le-Chatel, France
fYear
2000
fDate
2000
Firstpage
42675
Lastpage
42678
Abstract
CEA decided to realize the Megajoule Laser (LMJ) in two steps. At first, one laser chain will be built in the “Ligne d´Integration Laser” (LIL) at CEA-CESTA. The LIL will allow components qualification before the realization of the thirty laser chains for the Megajoule Laser. CEA has consulted four companies to carry out the LMJ Energy Bank. Thomson-CSF Detexis has been chosen by CEA to realize a 450 MJ energy bank. The contract of LMJ Energy Bank realization gives the complete result responsibility to Thomson-CSF, according to CEA specifications. CEA gave Thomson-CSF the results of a three years LIMEIL Laboratory experimentation on several components, like power supply, capacitors, resistors, high energy switches and cabling system studies
Keywords
pulsed power supplies; 450 MJ; CEA-project; Energy Bank; LIMEIL Laboratory experimentation; Ligne d´Integration Laser; Megajoule Laser; Thomson-CSF Detexis; cabling system; capacitors; components qualification; high energy switches; megajoule project power conditioning; power supply; resistors;
fLanguage
English
Publisher
iet
Conference_Titel
Pulsed Power 2000 (Digest No. 2000/053), IEE Symposium
Conference_Location
London
Type
conf
DOI
10.1049/ic:20000280
Filename
859557
Link To Document