• DocumentCode
    2287767
  • Title

    Crew constraints in Lagrangian relaxation unit commitment

  • Author

    Peterson, William L. ; Brammer, Steven R.

  • Author_Institution
    Stagg Syst. Inc., Houston, TX, USA
  • fYear
    1995
  • fDate
    26-29 Mar 1995
  • Firstpage
    381
  • Lastpage
    384
  • Abstract
    Bringing a generating unit online from an offline state requires dedicated manpower for a few hours to monitor and control the plant systems. Usually the work crew at a power plant is limited and insufficient to start multiple units simultaneously. Computer simulation of the unit commitment process has traditionally excluded such constraints on maintenance crews at the plants. This paper addresses this limitation, presenting an extension to the Lagrangian relaxation algorithm that accounts for crew constraints in the resulting unit commitment solution. The technique has been implemented on a large scale power system, and results are shown using actual power system data
  • Keywords
    control system analysis computing; large-scale systems; load dispatching; load distribution; power station control; power system analysis computing; relaxation theory; Lagrangian relaxation algorithm; computer simulation; control analysis; large scale power system; power plant; unit commitment; work crew constraints; Computer simulation; Computerized monitoring; Control systems; Cost function; Fuels; IEEE members; Lagrangian functions; Large-scale systems; Power generation; Power systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Southeastcon '95. Visualize the Future., Proceedings., IEEE
  • Conference_Location
    Raleigh, NC
  • Print_ISBN
    0-7803-2642-3
  • Type

    conf

  • DOI
    10.1109/SECON.1995.513122
  • Filename
    513122