• DocumentCode
    2304737
  • Title

    The management of testing of large systems

  • Author

    Plowman, R.J.

  • Author_Institution
    Rolls-Royce plc, Derby, UK
  • fYear
    1994
  • fDate
    5-7 Sep 1994
  • Firstpage
    58
  • Lastpage
    64
  • Abstract
    This paper examines the EMC testing and qualifying of a large industrial plant. There are a number of aspects to be addressed when EMC qualifying large distributed systems. These range from the control plan and EMC assessment, to the actual test methods. All major aspects of the control plan are discussed, including management/organisation, design, risk assessment, testing and test standards. To help with EMC risk assessment the concept of the EMC analysis sheet is introduced together with its evolution in parallel with the plant design. The paper also addresses site testing and one of the main site tests, bulk current testing, particularly the long line test
  • Keywords
    electromagnetic compatibility; measurement standards; EMC analysis sheet; EMC assessment; EMC testing; bulk current testing; control plan; large distributed systems; large industrial plant; large systems; long line test; management/organisation; plant design; risk assessment; site testing; test methods; test standards;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electromagnetic Compatibility, 1994., Ninth International Conference on
  • Conference_Location
    Manchester
  • Print_ISBN
    0-85296-622-9
  • Type

    conf

  • DOI
    10.1049/cp:19940676
  • Filename
    346648