DocumentCode
2305848
Title
Cellular manufacturing system scheduling under fuzzy constraints: A group technology perspective
Author
Xing, Bo ; Gao, Wen-Jing ; Nelwamondo, Fulufhelo V. ; Battle, Kimberly ; Marwala, Tshilidzi
Author_Institution
Fac. of Eng. & the Built Environ., Univ. of Johannesburg, Johannesburg, South Africa
fYear
2010
fDate
18-23 July 2010
Firstpage
1
Lastpage
8
Abstract
In this article, we attempt to solve cellular manufacturing system (CMS) scheduling problem from group technology point of view. Since the operations of a job in a CMS can be performed on more than one machine within a cell, the scheduling problem of the CMS is always considered as a computationally hard problem. Two approaches called fuzzy logic and fuzzy MAX-MIN ant system are employed respectively. Under the consideration of multiple criteria, the performance of different manufacturing cells in a CMS is improved by means of proposed methodologies.
Keywords
cellular manufacturing; fuzzy logic; job shop scheduling; CMS scheduling; cellular manufacturing system scheduling; computationally hard problem; fuzzy MAX-MIN ant system; fuzzy constraints; fuzzy logic; group technology perspective; Drilling; Fuzzy logic; Fuzzy sets; Indexes; Job shop scheduling; Manufacturing; Milling;
fLanguage
English
Publisher
ieee
Conference_Titel
Fuzzy Systems (FUZZ), 2010 IEEE International Conference on
Conference_Location
Barcelona
ISSN
1098-7584
Print_ISBN
978-1-4244-6919-2
Type
conf
DOI
10.1109/FUZZY.2010.5584234
Filename
5584234
Link To Document