The schedule control of engineering project based on particle swarm algorithm
Author
Xiao Zheng ; Liu, Zhenning
Author_Institution
Sch. of Econ. & Manage., Jiangxi Univ. of Sci. & Technol., Ganzhou, China
Volume
1
fYear
2010
fDate
June 29 2010-July 1 2010
Firstpage
184
Lastpage
187
Abstract
The schedule control of engineering project a unique stage of the project management, which plays an important role in the success or failure of the project. This paper analyzed the various impact factors of project progress, and developed the mathematical model of schedule control based on the quantitative description of the relationship between impact factors with the schedule control of the project. In order to improve the speed and accuracy of solving, this article uses the particle swarm algorithm to solve the above model. Finally, the empirical research showed that the method is effective in the field of project schedule control.
Keywords
construction; particle swarm optimisation; project management; scheduling; construction project; engineering project; mathematical model; particle swarm algorithm; project management; quantitative description; schedule control; Availability; Gallium nitride; particle swarm algorithm; project; schedule control;
fLanguage
English
Publisher
ieee
Conference_Titel
Communication Systems, Networks and Applications (ICCSNA), 2010 Second International Conference on
Conference_Location
Hong Kong
Print_ISBN
978-1-4244-7475-2
Type
conf
DOI
10.1109/ICCSNA.2010.5588681
Filename
5588681
Link To Document