• DocumentCode
    2368926
  • Title

    Study on the cost/benefit/optimization of software safety test

  • Author

    Li, Meng ; Xu, Zhu

  • Author_Institution
    Dept. of Comput. Sci. & Eng., Tongji Univ., Shanghai, China
  • fYear
    2003
  • fDate
    16-19 Nov. 2003
  • Firstpage
    510
  • Abstract
    Although the safety-critical system has high demand on safety, the cost of software test therefore must be taken account of. In the test of railway computer interlocking software carried out, the safety test for a station software last several months, therefore, in order to reduce the test time, it is practical to choose functions from the function set to test through optimization. Software safety test is realized by running testing cases at the cost of labor and time. It is expected to detect dangerous function defects and reduce system loss to gain benefit. Optimization strategy is a best choice to consider testing cases.
  • Keywords
    cost-benefit analysis; linear programming; optimisation; program testing; railway safety; safety-critical software; software cost estimation; dangerous function defects; linear programming; railway interlocking software; safety-critical software; software safety test; software test cost; station software; test optimization; Computer science; Cost function; Costs; Frequency; Linear programming; Optimization methods; Rail transportation; Railway engineering; Railway safety; Software economics; Software safety; Software testing; System software; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Test Symposium, 2003. ATS 2003. 12th Asian
  • ISSN
    1081-7735
  • Print_ISBN
    0-7695-1951-2
  • Type

    conf

  • DOI
    10.1109/ATS.2003.1250881
  • Filename
    1250881