DocumentCode
2377156
Title
Project planning and estimation with Ask Pete
Author
Kurtz, Tim
Author_Institution
NASA Glenn Res. Center, Sci. Applications Int. Corp., USA
fYear
2001
fDate
2001
Firstpage
55
Lastpage
61
Abstract
Ask Pete is a software project planning tool which incorporates methodologies for cost and schedule estimation through COCOMO II; corporate risk and resource investment through the use of the Control Level methodology; and the need for external verification and validation activities through the NASA IV&V criteria. The paper examines each of these methodologies and how they interrelate in the tool to provide the characterization necessary for project planning and estimation
Keywords
project management; project support environments; software cost estimation; software quality; Ask Pete; COCOMO II; Control Level methodology; NASA IV; NASA V; corporate risk; cost estimation; external validation; external verification; project estimation; project planning; resource investment; schedule estimation; software project planning tool; Amplitude shift keying; Application software; Costs; Databases; Documentation; Logic; NASA; Programming; Risk management; User interfaces;
fLanguage
English
Publisher
ieee
Conference_Titel
Software Engineering Workshop, 2001. Proceedings. 26th Annual NASA Goddard
Conference_Location
Greenbelt, MD
Print_ISBN
0-7695-1456-1
Type
conf
DOI
10.1109/SEW.2001.992655
Filename
992655
Link To Document