• DocumentCode
    2377156
  • Title

    Project planning and estimation with Ask Pete

  • Author

    Kurtz, Tim

  • Author_Institution
    NASA Glenn Res. Center, Sci. Applications Int. Corp., USA
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    55
  • Lastpage
    61
  • Abstract
    Ask Pete is a software project planning tool which incorporates methodologies for cost and schedule estimation through COCOMO II; corporate risk and resource investment through the use of the Control Level methodology; and the need for external verification and validation activities through the NASA IV&V criteria. The paper examines each of these methodologies and how they interrelate in the tool to provide the characterization necessary for project planning and estimation
  • Keywords
    project management; project support environments; software cost estimation; software quality; Ask Pete; COCOMO II; Control Level methodology; NASA IV; NASA V; corporate risk; cost estimation; external validation; external verification; project estimation; project planning; resource investment; schedule estimation; software project planning tool; Amplitude shift keying; Application software; Costs; Databases; Documentation; Logic; NASA; Programming; Risk management; User interfaces;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Software Engineering Workshop, 2001. Proceedings. 26th Annual NASA Goddard
  • Conference_Location
    Greenbelt, MD
  • Print_ISBN
    0-7695-1456-1
  • Type

    conf

  • DOI
    10.1109/SEW.2001.992655
  • Filename
    992655